Press "Enter" to skip to content

Wind Farm Equipment Arrives in Porto Santo

The BBC BELEM, transporting material for future wind farms in Porto Santo, arrived shortly after 12:30 today in Porto Santo.

The cargo consists of “rolling” material, which must be unloaded as soon as possible. A process that is expected to be completed by Sunday.

A second ship, carrying turbines, should arrive in Porto Santo on the 4th of June.

Samantha Gannon

info at madeira-weekly.com

Views: 9

Mission News Theme by Compete Themes.
Madeira Weekly