The BBC BELEM, transporting material for future wind farms in Porto Santo, arrived shortly after 12:30 today in Porto Santo. The cargo consists of “rolling” material, which must be unloaded as soon as possible. A process that is expected to be completed by Sunday. A second ship, carrying turbines, should…

