The BBC BELEM, transporting material for future wind farms in Porto Santo, arrived shortly after 12:30 today in Porto Santo.
The cargo consists of “rolling” material, which must be unloaded as soon as possible. A process that is expected to be completed by Sunday.
A second ship, carrying turbines, should arrive in Porto Santo on the 4th of June.
Samantha Gannon
info at madeira-weekly.com
Views: 10







